WA Phone: (425) 487-1111 HI Phone: (808) 284-9042

Navigation:
Popular:
< Prev Next > Page 14 of 61
Marion Oliver McCaw Hall Project:
Marion Oliver McCaw Hall was designed by LMN and built by Skanska Construction

Click image to see more.

Location: 200 Mercer Street Seattle, WA

Finish Year: 2003

Architect: LMN

General: Skanska Construction

This exterior features over 80K square feet of siding and is readily visible from I-5. The custom color looks great and the windows and other elements were designed to align with certain corrugations.

Chapel of St. Ignatius Project:
Chapel of St. Ignatius was designed by Steven Holl and built by Skanska Construction

Click image to see more.

Location: 900 Broadway Seattle, WA

Finish Year: 1996

Architect: Steven Holl

General: Skanska Construction

This zinc job involved twisting barrel roofs and composite panels. Northshore Sheet Metal was awarded ABCs excellence in specialty contruction award for this job. The flat panels were supplied by Rheinzink and fabricated by Keith Panel Systems.

Rainier Vista Boys and Girls Club Project:
Rainier Vista Boys and Girls Club was designed by Weinstein AU and built by Sellen Construction

Click image to see more.

Location: 4520 Martin Luther King Jr Way South Seattle, WA

Finish Year: 2008

Architect: Weinstein AU

General: Sellen Construction

Northclad EF aluminum panels and AEP siding give this building a distinctive look.

Garfield High School Project:
Garfield High School was designed by BLRB and built by Lease Crutcher Lewis Construction

Click image to see more.

Location: 400 23rd Ave Seattle, WA

Finish Year: 2008

Architect: BLRB

General: Lease Crutcher Lewis Construction

©2017 Northshore Exteriors Inc.
Close X
Loading...