SNBL Addition Project:
SNBL Addition was designed by Gary Parkinson RA and built by

Click image to see more.

Location: 6605 Merrill Creek Parkway Everett, WA

Finish Year: 2006

Architect: Gary Parkinson RA

These panels are from Proclad. The .063 panels with stiffeners provide a very flat appearance and are all formed with lines in a grid.

Masonic Lodge Project:
Masonic Lodge was designed by  and built by

Click image to see more.

Location: Seattle, WA

Finish Year: 2008

Your restoration deserves a craftsman's touch. We replicated this historic cornice with care, by hand and with the aid of computerized fabrication, for a very close match.

E. Residence Project:
E. Residence was designed by Sturman and built by

Click image to enlarge.

Location: 6202 37th Ave NE Seattle, WA

Finish Year: 2005

Architect: Sturman

Zinc siding and an AEP metal roof complete the look on this artists studio.

Fishscale Cabin Project:
Fishscale Cabin was designed by Elbert and built by

Click image to enlarge.

Location: Clinton, Washington Whidbey Island, WA

Finish Year: 2004

Architect: Elbert

These Terne Coated Stainless Steel shingles were hand made in our shop. They will weather in the salt spray, but never need paint. The curved anodized aluminum bullnose fascia is Jetsons retro and unique.

Rosalie Whyle Doll Museum Project:
Rosalie Whyle Doll Museum was designed by  and built by

Click image to enlarge.

Location: 1116 108th Ave. NE Bellevue, WA

Finish Year: 1994

This building features a double radiused gutter housing; A true work of art.

South Center Mall Addition Project:
South Center Mall Addition was designed by  and built by

Click image to see more.

Location: Seattle, WA

Finish Year: 2008

North Kitsap Baptist Church Project:
North Kitsap Baptist Church was designed by  and built by

Click image to enlarge.

Location: 20516 Little Valley Road NE Poulsbo, WA

Finish Year: 2005

This is an AEP Design Span Roof in Hemlock Green. We installed over an existing brown composition roof and the building looked dramatically more modern in 2 weeks.

Cristalla Project:
Cristalla was designed by Weber Thompson and built by

Click image to enlarge.

Location: 2nd and Lenora Seattle, WA

Finish Year: 2005

Architect: Weber Thompson

Penthouse siding from AEP span and quality flashing on various levels help make this one of the most popular condos in Seattle.

The Mosaic Apartments Project:
The Mosaic Apartments was designed by Driscoll and built by

Click image to enlarge.

Location: 668 South Lane St Seattle, WA

Finish Year: 2002

Architect: Driscoll

Leeward Community College Project:
Leeward Community College was designed by Urban Works Inc and built by Absher Construction

Click image to see more.

Location: 94-045 Ala Ike Street Pearl City, HI

Finish Year: 2013

Architect: Urban Works Inc

General: Absher Construction

This sleek new building featured thousands of square feet of NorthClad ACM siding and soffits and trim to match. Everyone loves the look and quality!

Phantom Lake Elementary Project:
Phantom Lake Elementary was designed by Northwest Architectural Company and built by Absher Construction

Click image to enlarge.

Location: 1050 160th Ave SE Bellevue, WA

Finish Year: 2002

Architect: Northwest Architectural Company

General: Absher Construction

This school features lots of AEP metal siding and flashing, as well as our large gutter.

Monroe Correctional IMU and SEG Units Project:
Monroe Correctional IMU and SEG Units was designed by Integrus and built by Absher Construction

Click image to enlarge.

Location: Monroe, WA

Finish Year: 2005

Architect: Integrus

General: Absher Construction

We performed the screen wall siding and flashing with AEP materials.

Cougar Mountain Jr High School Project:
Cougar Mountain Jr High School was designed by Erickson McGovern and built by Absher Construction

Click image to enlarge.

Location: 5108 260th St E Graham, WA

Finish Year: 2003

Architect: Erickson McGovern

General: Absher Construction

This features our fabulous 7" continuous gutter and tight flashing workmanship.

Asian Counseling and Referral Services Project:
Asian Counseling and Referral Services was designed by DKA and built by Aldrich and Associates

Click image to see more.

Location: 3639 M.L. King Jr. Way South Seattle, WA

Finish Year: 2008

Architect: DKA

General: Aldrich and Associates

This job featured several profiles of metal siding and roofing, in three colors, for a great look.

Avalon Meydenbauer Project:
Avalon Meydenbauer was designed by GGLO and built by Avalon Bay Communities

Click image to see more.

Location: Bellevue, WA

Finish Year: 2008

Architect: GGLO

General: Avalon Bay Communities

Note the custom fabricated square panels and the AEP Prestige 12" panels. Northclad's flush square panels have a flatter apearance than most "2 sides up 2 sides down panels".

Seahawks Practice Facility Project:
Seahawks Practice Facility was designed by Crawford Architects and built by Bayley Construction

Click image to see more.

Location: Seattle, WA

Finish Year: 2008

Architect: Crawford Architects

General: Bayley Construction

Lake City Civic Core Project:
Lake City Civic Core was designed by ARC and built by Bayley Construction

Click image to enlarge.

Location: 12501 28th Ave Ne Seattle, WA

Finish Year: 2005

Architect: ARC

General: Bayley Construction

AEP siding combined with custom flashing make this building look like a proper civic center.

Lynnwood Transit Center Project:
Lynnwood Transit Center was designed by Zimmer Gunsul Frasca and built by Bayley Construction

Click image to enlarge.

Location: 20121 48th Avenue West Lynwood, WA

Finish Year: 2003

Architect: Zimmer Gunsul Frasca

General: Bayley Construction

The transit center features curved metal roofing from AEP, as well as solid aluminum siding panels on the buildings. The aluminum was fabricated in our shop, including welded corners.

White River High School Project:
White River High School was designed by Integrus and built by Bayley Construction

Click image to enlarge.

Location: 26928 120th St E Buckley, WA

Finish Year: 2003

Architect: Integrus

General: Bayley Construction

We took this over when one of our competitors went out of business. The building features lots of metal roofing and siding adn some stainless gutters.

Issaquah Bank Expansion Project:
Issaquah Bank Expansion was designed by Baylis and built by Bayley Construction

Click image to enlarge.

Location: 1055 NW Maple St. Issaquah, WA

Finish Year: 2003

Architect: Baylis

General: Bayley Construction

Nice flashing.

SeaTac Airport Station Project:
SeaTac Airport Station was designed by Hatch Mott MacDonald and built by Bayley Construction

Click image to see more.

Location: SeaTac Airport SeaTac, WA

Finish Year: 2009

Architect: Hatch Mott MacDonald

General: Bayley Construction

T Residence Project:
T Residence was designed by Nelson Miller and built by Bellan Construction

Click image to enlarge.

Location: Medina, WA

Finish Year: 2004

Architect: Nelson Miller

General: Bellan Construction

Not visible in the picture is the heavy aluminum siding, installed around a curve and on the deck.

J Residence Project:
J Residence was designed by Baylis and built by Bender Chaffey

Click image to enlarge.

Location: Seattle, WA

Finish Year: 2008

Architect: Baylis

General: Bender Chaffey

Evergreen Surgery and Physicians Center Project:
Evergreen Surgery and Physicians Center was designed by Kaplan Mclaughlin Diaz and built by Berschauer Phillips Construction

Click image to enlarge.

Location: 12040 NE 128th St. Kirkland, WA

Finish Year: 2002

Architect: Kaplan Mclaughlin Diaz

General: Berschauer Phillips Construction

K.M.D. designed a very cool screen wall and penthouse enclosure, with AEP custom color products gridded out in an interesting way.

Peter G Schmidt Elementary Project:
Peter G Schmidt Elementary was designed by BJSS Duarte Bryant and built by Berschauer Phillips Construction

Click image to enlarge.

Location: 6600 Capitol Blvd Tumwater, WA

Finish Year: 2005

Architect: BJSS Duarte Bryant

General: Berschauer Phillips Construction

Our flashing accents the new roofing on this Tumwater school.

Seattle Central C.C. Fine Arts Building Project:
Seattle Central C.C. Fine Arts Building was designed by Johnson and built by Bird Construction

Click image to enlarge.

Location: 801 East Pine Street Seattle, WA

Finish Year: 2000

Architect: Johnson

General: Bird Construction

Cornice repair and replacement is one of our specialties. Our computerized brake can replicate historic metal features. Our craftsmen can install it better than the original.

Puyallup Tribe - Elders Center Project:
Puyallup Tribe - Elders Center was designed by ARC and built by BNBuilders

Click image to enlarge.

Location: 3111 Duct Cho St Puyallup, WA

Finish Year: 2009

Architect: ARC

General: BNBuilders

Arlington Police Station Project:
Arlington Police Station was designed by Schreiber and Lane and built by CDK construction

Click image to enlarge.

Location: 110 E. Third st. Arlington, WA

Finish Year: 2005

Architect: Schreiber and Lane

General: CDK construction

VM Zinc flush panels we fabricated in our shop are punctuated by horizontal accent bands.

Turner Office Building Project:
Turner Office Building was designed by  and built by Chinn Construction

Click image to enlarge.

Location: Kirkland, WA

Finish Year: 2003

General: Chinn Construction

The Citadel composites are installed with extrusions at the joints for a picture-framed unique look.

Lewis Creek Park Visitors Center Project:
Lewis Creek Park Visitors Center was designed by Boxwood and built by Chinn Construction

Click image to enlarge.

Location: 5504 Lakemont Blvd SE Bellevue, WA

Finish Year: 2005

Architect: Boxwood

General: Chinn Construction

This building features a large aluminum clad scupper trough that is unique and interesting.

Main Place Mixed Use Project:
Main Place Mixed Use was designed by Baylis and built by Chinn Construction

Click image to enlarge.

Location: 10245 Main St. Bellevue, WA

Finish Year: 2005

Architect: Baylis

General: Chinn Construction

AEPs Nu-Wave siding and our flashing complement this new Bellevue building.

Eastlake Mixed Use Project:
Eastlake Mixed Use was designed by Weber Thompson and built by Chinn Construction

Click image to enlarge.

Location: 3217 Eastlake Ave E Seattle, WA

Finish Year: 2003

Architect: Weber Thompson

General: Chinn Construction

High quality flashing.