Saint Marks Cathedral Project:
Saint Marks Cathedral was designed by  and built by Sellen Construction

Click image to enlarge.

Location: Seattle, WA

Finish Year: 1998

General: Sellen Construction

We formed all the copper panels for this roof in our shop as well as the Celtic Cross and siding.

Alderwood Middle School Project:
Alderwood Middle School was designed by Integrus and built by Skanska

Click image to enlarge.

Location: Edmonds, WA

Finish Year: 2017

Architect: Integrus

General: Skanska

This project featured a nice mix of siding products from AEP Span

Lincoln Square Project:
Lincoln Square was designed by Sclater Partners and built by Skanska Construction

Click image to see more.

Location: 604 Bellevue Way NE Bellevue, WA

Finish Year: 2005

Architect: Sclater Partners

General: Skanska Construction

Lincoln Square features over 40k square feet of composite siding panels, in three colors. The panels were provided by Centria. NSSM shop drawings helped manage the dimensions between trades for this fabulous looking building in Bellevue.

Lincoln Square Siding Project:
Lincoln Square Siding was designed by Sclater Partners and built by Skanska Construction

Click image to enlarge.

Location: 604 Bellevue Way NE Bellevue, WA

Finish Year: 2005

Architect: Sclater Partners

General: Skanska Construction

Northshore simultaneously performed the sheet metal siding on the hotel and retail portions of Lincoln Square during the installation of the composite panels. Three separate profiles of siding were implemented.