Seahawk Stadium Project:
Seahawk Stadium was designed by Elerbe Becket and built by Turner Construction

Click image to enlarge.

Location: Washington State Football/Soccer Stadium Seattle, WA

Finish Year: 2002

Architect: Elerbe Becket

General: Turner Construction

We performed lots of siding work here, including the perforated metal on the score tower and the exterior walls utilizing several custom colors and various profiles of Centria siding. We did not do the vending booths.

Lincoln Square Siding Project:
Lincoln Square Siding was designed by Sclater Partners and built by Skanska Construction

Click image to enlarge.

Location: 604 Bellevue Way NE Bellevue, WA

Finish Year: 2005

Architect: Sclater Partners

General: Skanska Construction

Northshore simultaneously performed the sheet metal siding on the hotel and retail portions of Lincoln Square during the installation of the composite panels. Three separate profiles of siding were implemented.

Blakeley Village Project:
Blakeley Village was designed by Mithun and built by Walsh Construction

Click image to see more.

Location: 4747 30th Ave NE Seattle, WA

Finish Year: 2003

Architect: Mithun

General: Walsh Construction

This job features Zinc panels. The metal siding contributes to the distinctive look of this award winning building which provides student housing for the University of Washington.

Marion Oliver McCaw Hall Project:
Marion Oliver McCaw Hall was designed by LMN and built by Skanska Construction

Click image to see more.

Location: 200 Mercer Street Seattle, WA

Finish Year: 2003

Architect: LMN

General: Skanska Construction

This exterior features over 80K square feet of siding and is readily visible from I-5. The custom color looks great and the windows and other elements were designed to align with certain corrugations.

Seahawks Practice Facility Project:
Seahawks Practice Facility was designed by Crawford Architects and built by Bayley Construction

Click image to see more.

Location: Seattle, WA

Finish Year: 2008

Architect: Crawford Architects

General: Bayley Construction

REI 2029 Project:
REI 2029 was designed by Mithun and built by GLY Construction

Click image to enlarge.

Location: 222 Yale Ave N Seattle, WA

Finish Year: 1996

Architect: Mithun

General: GLY Construction

This building houses the worlds tallest indoor climbing structure. Its high profile location is seen by hundreds of thousands of people every day. We installed the custom color siding in two profiles on its exterior.

South Center Mall Addition Project:
South Center Mall Addition was designed by  and built by

Click image to see more.

Location: Seattle, WA

Finish Year: 2008

Marina Point Office Building Project:
Marina Point Office Building was designed by Carlson and built by Colacurcio Brothers Construction

Click image to see more.

Location: 1001 Thomas Glenn Drive Bellingham, WA

Finish Year: 2001

Architect: Carlson

General: Colacurcio Brothers Construction

Marina Point is high end retail and office facility located on the water in Bellingham. Its zinc siding (Rheinzink) exterior is a big part of its appeal. We used custom width panels to assure alignment with the window jambs.