WA Phone: (425) 740-3700 HI Phone: (808) 284-9042

Navigation:
Popular:
< Prev Next > Page 21 of 36
Lincoln Square Project:
Lincoln Square was designed by Sclater Partners and built by Skanska Construction

Click image to see more.

Location: 604 Bellevue Way NE Bellevue, WA

Finish Year: 2005

Architect: Sclater Partners

General: Skanska Construction

Lincoln Square features over 40k square feet of composite siding panels, in three colors. The panels were provided by Centria. NSSM shop drawings helped manage the dimensions between trades for this fabulous looking building in Bellevue.

Leeward Community College Project:
Leeward Community College was designed by Urban Works Inc and built by Absher Construction

Click image to see more.

Location: 94-045 Ala Ike Street Pearl City, HI

Finish Year: 2013

Architect: Urban Works Inc

General: Absher Construction

This sleek new building featured thousands of square feet of NorthClad ACM siding and soffits and trim to match. Everyone loves the look and quality!

©2024 Northshore Exteriors Inc.
Close X
Loading...