Click image to see more.
Location: 450 110th Ave NE Bellevue, WA
Finish Year: 2006
Architect: SRG Partnership
General: Lease Crutcher Lewis Construction
Our design modifications helped shave several million dollars off the recladding of Bellevues new city hall. The siding is formed from .063 aluminum in two colors and several profiles.
Click image to enlarge.
Location: 510 Bellevue Way NE Bellevue, WA
Finish Year: 2001
Architect: Steven Holl
General: Sellen Construction
While not actually composite panels , these solid aluminum panels feature the same attention to lines found in most composite jobs.
Click image to see more.
Note the custom fabricated square panels and the AEP Prestige 12" panels. Northclad's flush square panels have a flatter apearance than most "2 sides up 2 sides down panels".
Click image to see more.
Location: 3639 M.L. King Jr. Way South Seattle, WA
Finish Year: 2008
Architect: DKA
General: Aldrich and Associates
This job featured several profiles of metal siding and roofing, in three colors, for a great look.
Click image to enlarge.
Location: Edmonds, WA
Finish Year: 2017
Architect: Integrus
General: Skanska
This project featured a nice mix of siding products from AEP Span
Click image to see more.
Location: Honolulu, HI
Finish Year: 2012
General: Designer Built Systems
Northshore measured and supplied the composite panels for these dramatic transit shelters. Careful attention was provided to create these unique and functional 3D structures. Looks Great!
Click image to see more.
Location: 200 West Highlands Seattle, WA
Finish Year: 2009
Architect: Mithun
General: Walsh Construction
Click image to see more.
Location: 1519 Minor Seattle, WA
Finish Year: 2013
Architect: Perkins and Will
General: Howard S. Wright
We clad this exciting in city building with American Fiber Cement, Vivix and Northclad ACM.