WA Phone: (425) 487-1111 HI Phone: (808) 284-9042

Navigation:
Popular:
< Prev Next > Page 1 of 1
Current filter: City is Bellevue Click here to show all 248 jobs
Bellevue Science and Technology Building Project:
Bellevue Science and Technology Building was designed by Miller Hull and built by Mortenson Construction

Click image to see more.

Location: 3000 Landerholm Circle SE Bellevue, WA

Finish Year: 2009

Architect: Miller Hull

General: Mortenson Construction

Avalon Meydenbauer Project:
Avalon Meydenbauer was designed by GGLO and built by Avalon Bay Communities

Click image to see more.

Location: Bellevue, WA

Finish Year: 2008

Architect: GGLO

General: Avalon Bay Communities

Note the custom fabricated square panels and the AEP Prestige 12" panels. Northclad's flush square panels have a flatter apearance than most "2 sides up 2 sides down panels".

City Center Plaza Project:
City Center Plaza was designed by NBBJ and built by Howard S Wright Construction

Click image to see more.

Location: Bellevue, WA

Finish Year: 2008

Architect: NBBJ

General: Howard S Wright Construction

This fabulous building featured Northclad panels in .125 aluminum, football shaped column covers, and AEP custom color siding.

Lincoln Square Project:
Lincoln Square was designed by Sclater Partners and built by Skanska Construction

Click image to see more.

Location: 604 Bellevue Way NE Bellevue, WA

Finish Year: 2005

Architect: Sclater Partners

General: Skanska Construction

Lincoln Square features over 40k square feet of composite siding panels, in three colors. The panels were provided by Centria. NSSM shop drawings helped manage the dimensions between trades for this fabulous looking building in Bellevue.

Bellevue City Hall Project:
Bellevue City Hall was designed by SRG Partnership and built by Lease Crutcher Lewis Construction

Click image to see more.

Location: 450 110th Ave NE Bellevue, WA

Finish Year: 2006

Architect: SRG Partnership

General: Lease Crutcher Lewis Construction

Our design modifications helped shave several million dollars off the recladding of Bellevues new city hall. The siding is formed from .063 aluminum in two colors and several profiles.

Group Health Medical Center Project:
Group Health Medical Center was designed by Northwest Architectural Company and built by Mortenson Construction

Click image to see more.

Location: 925 116th NE Bellevue, WA

Finish Year: 2008

Architect: Northwest Architectural Company

General: Mortenson Construction

Northclad AL panels were featured on Group Health's new building.

Lincoln Square Siding Project:
Lincoln Square Siding was designed by Sclater Partners and built by Skanska Construction

Click image to enlarge.

Location: 604 Bellevue Way NE Bellevue, WA

Finish Year: 2005

Architect: Sclater Partners

General: Skanska Construction

Northshore simultaneously performed the sheet metal siding on the hotel and retail portions of Lincoln Square during the installation of the composite panels. Three separate profiles of siding were implemented.

Phantom Lake Elementary Project:
Phantom Lake Elementary was designed by Northwest Architectural Company and built by Absher Construction

Click image to enlarge.

Location: 1050 160th Ave SE Bellevue, WA

Finish Year: 2002

Architect: Northwest Architectural Company

General: Absher Construction

This school features lots of AEP metal siding and flashing, as well as our large gutter.

Bellevue Art Museum Project:
Bellevue Art Museum was designed by Steven Holl and built by Sellen Construction

Click image to enlarge.

Location: 510 Bellevue Way NE Bellevue, WA

Finish Year: 2001

Architect: Steven Holl

General: Sellen Construction

While not actually composite panels , these solid aluminum panels feature the same attention to lines found in most composite jobs.

Crate and Barrel Bellevue Square Project:
Crate and Barrel Bellevue Square was designed by NBBJ and built by Skanska Construction

Click image to enlarge.

Location: Bellevue Square Bellevue, WA

Finish Year: 2001

Architect: NBBJ

General: Skanska Construction

White aluminum panels and zinc soffit and fascia panels complete the look.

Rosalie Whyle Doll Museum Project:
Rosalie Whyle Doll Museum was designed by  and built by

Click image to enlarge.

Location: 1116 108th Ave. NE Bellevue, WA

Finish Year: 1994

This building features a double radiused gutter housing; A true work of art.

Residence Inn By Marriott Bellevue Project:
Residence Inn By Marriott Bellevue was designed by Johnson Braund and built by Ferguson Construction

Click image to see more.

Location: 605 114th Ave SE Bellevue, WA

Finish Year: 2008

Architect: Johnson Braund

General: Ferguson Construction

Lewis Creek Park Visitors Center Project:
Lewis Creek Park Visitors Center was designed by Boxwood and built by Chinn Construction

Click image to enlarge.

Location: 5504 Lakemont Blvd SE Bellevue, WA

Finish Year: 2005

Architect: Boxwood

General: Chinn Construction

This building features a large aluminum clad scupper trough that is unique and interesting.

Main Place Mixed Use Project:
Main Place Mixed Use was designed by Baylis and built by Chinn Construction

Click image to enlarge.

Location: 10245 Main St. Bellevue, WA

Finish Year: 2005

Architect: Baylis

General: Chinn Construction

AEPs Nu-Wave siding and our flashing complement this new Bellevue building.

Summit at Bellevue Project:
Summit at Bellevue was designed by LMN and built by Sellen Construction

Click image to enlarge.

Location: 10885 NE 4th Street Bellevue Bellevue, WA

Finish Year: 2003

Architect: LMN

General: Sellen Construction

We provided Centria MR36 panels in a custom color and flashing on both phases of this Bellevue high rise.

Ridgepoint Project:
Ridgepoint was designed by Baylis and built by Skanska Construction

Click image to enlarge.

Location: 2700 156th Ave NE Bellevue, WA

Finish Year: 2002

Architect: Baylis

General: Skanska Construction

We provided the custom formed flush panels below the cornice as well as the sunscreen, which we provided custom extrusions and welded brackets for.

Pro Sports Club Project:
Pro Sports Club was designed by Synthesis PC and built by GLY Construction

Click image to enlarge.

Location: 4455 148th Ave Ne Bellevue, WA

Finish Year: 2003

Architect: Synthesis PC

General: GLY Construction

We performed flashing on this building and its parking structure.

Vue Tower Project:
Vue Tower was designed by Collins Woerman and built by Washington Hanover LLC

Click image to see more.

Location: 10710 NE 10th St Bellevue, WA

Finish Year: 2009

Architect: Collins Woerman

General: Washington Hanover LLC

Current filter: City is Bellevue Click here to show all 248 jobs
©2018 Northshore Exteriors Inc.
Close X
Loading...