WA Phone: (425) 740-3700 HI Phone: (808) 284-9042

Navigation:
Popular:
< Prev Next > Page 4 of 5
Current filter: Metal Type is Siding Click here to show all 72 jobs
River Park Office Building Project:
River Park Office Building was designed by Callison and built by Howard S Wright Construction

Click image to see more.

Location: 7803-7905 159th Pl NE Redmond, WA

Finish Year: 2008

Architect: Callison

General: Howard S Wright Construction

Northclad AL panels installed in a custom color give this building a really fine look that is similar to composites, but at an affordable price.

Bellevue City Hall Project:
Bellevue City Hall was designed by SRG Partnership and built by Lease Crutcher Lewis Construction

Click image to see more.

Location: 450 110th Ave NE Bellevue, WA

Finish Year: 2006

Architect: SRG Partnership

General: Lease Crutcher Lewis Construction

Our design modifications helped shave several million dollars off the recladding of Bellevues new city hall. The siding is formed from .063 aluminum in two colors and several profiles.

Group Health Medical Center Project:
Group Health Medical Center was designed by Northwest Architectural Company and built by Mortenson Construction

Click image to see more.

Location: 925 116th NE Bellevue, WA

Finish Year: 2008

Architect: Northwest Architectural Company

General: Mortenson Construction

Northclad AL panels were featured on Group Health's new building.

Seahawk Stadium Project:
Seahawk Stadium was designed by Elerbe Becket and built by Turner Construction

Click image to enlarge.

Location: Washington State Football/Soccer Stadium Seattle, WA

Finish Year: 2002

Architect: Elerbe Becket

General: Turner Construction

We performed lots of siding work here, including the perforated metal on the score tower and the exterior walls utilizing several custom colors and various profiles of Centria siding. We did not do the vending booths.

Lincoln Square Siding Project:
Lincoln Square Siding was designed by Sclater Partners and built by Skanska Construction

Click image to enlarge.

Location: 604 Bellevue Way NE Bellevue, WA

Finish Year: 2005

Architect: Sclater Partners

General: Skanska Construction

Northshore simultaneously performed the sheet metal siding on the hotel and retail portions of Lincoln Square during the installation of the composite panels. Three separate profiles of siding were implemented.

Blakeley Village Project:
Blakeley Village was designed by Mithun and built by Walsh Construction

Click image to see more.

Location: 4747 30th Ave NE Seattle, WA

Finish Year: 2003

Architect: Mithun

General: Walsh Construction

This job features Zinc panels. The metal siding contributes to the distinctive look of this award winning building which provides student housing for the University of Washington.

Marion Oliver McCaw Hall Project:
Marion Oliver McCaw Hall was designed by LMN and built by Skanska Construction

Click image to see more.

Location: 200 Mercer Street Seattle, WA

Finish Year: 2003

Architect: LMN

General: Skanska Construction

This exterior features over 80K square feet of siding and is readily visible from I-5. The custom color looks great and the windows and other elements were designed to align with certain corrugations.

Seahawks Practice Facility Project:
Seahawks Practice Facility was designed by Crawford Architects and built by Bayley Construction

Click image to see more.

Location: Seattle, WA

Finish Year: 2008

Architect: Crawford Architects

General: Bayley Construction

Current filter: Metal Type is Siding Click here to show all 72 jobs
©2024 Northshore Exteriors Inc.
Close X
Loading...