Click image to see more.
Location: 925 116th NE Bellevue, WA
Finish Year: 2008
Architect: Northwest Architectural Company
General: Mortenson Construction
Northclad AL panels were featured on Group Health's new building.
Click image to see more.
Location: 6605 Merrill Creek Parkway Everett, WA
Finish Year: 2006
Architect: Gary Parkinson RA
These panels are from Proclad. The .063 panels with stiffeners provide a very flat appearance and are all formed with lines in a grid.
Click image to enlarge.
Location: Washington State Football/Soccer Stadium Seattle, WA
Finish Year: 2002
Architect: Elerbe Becket
General: Turner Construction
We performed lots of siding work here, including the perforated metal on the score tower and the exterior walls utilizing several custom colors and various profiles of Centria siding. We did not do the vending booths.
Click image to see more.
Location: 900 Pacific Avenue Everett, WA
Finish Year: 2002
Architect: NBBJ
General: Newland Construction
This project features Trespa, a composite material from the Netherlands, in three custom colors. It also features a wall from Pro-clad, in Canada. The roofs drain through interesting stainless steel water features. NBBJ designed an exciting building.