Location: Washington State Football/Soccer Stadium Seattle, WA
Finish Year: 2002
Architect: Elerbe Becket
General: Turner Construction
We performed lots of siding work here, including the perforated metal on the score tower and the exterior walls utilizing several custom colors and various profiles of Centria siding. We did not do the vending booths.
Click image to enlarge.
Location: 604 Bellevue Way NE Bellevue, WA
Finish Year: 2005
Architect: Sclater Partners
General: Skanska Construction
Northshore simultaneously performed the sheet metal siding on the hotel and retail portions of Lincoln Square during the installation of the composite panels. Three separate profiles of siding were implemented.
Click image to see more.
Location: 4747 30th Ave NE Seattle, WA
Finish Year: 2003
Architect: Mithun
General: Walsh Construction
This job features Zinc panels. The metal siding contributes to the distinctive look of this award winning building which provides student housing for the University of Washington.
Click image to see more.
Location: 200 Mercer Street Seattle, WA
Finish Year: 2003
Architect: LMN
General: Skanska Construction
This exterior features over 80K square feet of siding and is readily visible from I-5. The custom color looks great and the windows and other elements were designed to align with certain corrugations.
Click image to see more.
Click image to enlarge.
This building houses the worlds tallest indoor climbing structure. Its high profile location is seen by hundreds of thousands of people every day. We installed the custom color siding in two profiles on its exterior.
Click image to see more.
Location: Seattle, WA
Finish Year: 2008
Click image to see more.
Location: 1001 Thomas Glenn Drive Bellingham, WA
Finish Year: 2001
Architect: Carlson
General: Colacurcio Brothers Construction
Marina Point is high end retail and office facility located on the water in Bellingham. Its zinc siding (Rheinzink) exterior is a big part of its appeal. We used custom width panels to assure alignment with the window jambs.
Click image to see more.
Location: 2815 Alaskan Way Seattle, WA
Finish Year: 2000
Architect: Fuller Sears
General: JR Abbott Construction
Fuller Sears won awards for the renovation of this old pier building. It has a great combination of color and profile. Challenges during the construction included the tight quarters and the wavy existing building.
Click image to see more.
Location: 24820 NE 36th St Redmond, WA
Finish Year: 2009
Architect: Callison
General: GLY Construction
Click image to enlarge.
Location: Honolulu, HI
Finish Year: 2019
Architect: Architects Hawaii
General: Watts
Click image to enlarge.
Location: Mercer Street Seattle, WA
Finish Year: 2018
Architect: NBBJ
General: Lease Crutcher Lewis
NorthClad Designer Series panels set upon Kingspan Karrier and Morin N-12 panels help the new annex blend seamlessly with the Opera House
Click image to see more.
Location: Honolulu, HI
Finish Year: 2018
Architect: Bohlin Cywinski Jackson (BCJ)
General: Layton
Northshore fabricated and installed this fabulously interesting 80,000 square foot parking screen and the specialty siding for Whole Foods
Click image to see more.
Location: Honolulu, HI
Finish Year: 2017
Architect: ADM
General: Swinerton
This project features some very fine finish work including aluminum panels with recessed or projecting reveals and some wire mesh shelving.
Click image to see more.
Location: Honolulu, HI
Finish Year: 2016
Architect: JPRA
General: DCK Pacific
Perhaps the most beautiful mall in the world, the IMP features many architectural features built by NorthClad and installed by Northshore
Click image to see more.
Location: Honolulu, HI
Finish Year: 2017
Architect: Nudell Architects
General: Nordic PCL
Fine Laser cut screen patterns and welded trim help make Mitsuwa Marketplace an attractive place to shop.