WA Phone: (425) 740-3700 HI Phone: (808) 284-9042

Navigation:
Popular:
< Prev Next > Page 7 of 8
Current filter: City is Seattle Click here to show all 72 jobs
Seahawks Practice Facility Project:
Seahawks Practice Facility was designed by Crawford Architects and built by Bayley Construction

Click image to see more.

Location: Seattle, WA

Finish Year: 2008

Architect: Crawford Architects

General: Bayley Construction

Seattle Childrens Theater Project:
Seattle Childrens Theater was designed by LMN and built by Sellen Construction

Click image to enlarge.

Location: Seattle, WA

Finish Year: 2001

Architect: LMN

General: Sellen Construction

Take a close look at the flashing as the curved roofs connect. We provided curved pieces in both directions. Also, see the whimsical conductor boxes, welded in the shapes of animals. This is a very cool building.

Saint Marks Cathedral Project:
Saint Marks Cathedral was designed by  and built by Sellen Construction

Click image to enlarge.

Location: Seattle, WA

Finish Year: 1998

General: Sellen Construction

We formed all the copper panels for this roof in our shop as well as the Celtic Cross and siding.

REI 2029 Project:
REI 2029 was designed by Mithun and built by GLY Construction

Click image to enlarge.

Location: 222 Yale Ave N Seattle, WA

Finish Year: 1996

Architect: Mithun

General: GLY Construction

This building houses the worlds tallest indoor climbing structure. Its high profile location is seen by hundreds of thousands of people every day. We installed the custom color siding in two profiles on its exterior.

Current filter: City is Seattle Click here to show all 72 jobs
©2024 Northshore Exteriors Inc.
Close X
Loading...