WA Phone: (425) 740-3700 HI Phone: (808) 284-9042

Navigation:
Popular:
< Prev Next > Page 1 of 3
Current filter: Metal Type is Siding Click here to show all 72 jobs
South Center Mall Addition Project:
South Center Mall Addition was designed by  and built by

Click image to see more.

Location: Seattle, WA

Finish Year: 2008

Husky Stadium Renovation Project:
Husky Stadium Renovation was designed by 360 Architecture and built by Turner

Click image to enlarge.

Location: Montlake Blvd Seattle, WA

Finish Year: 2013

Architect: 360 Architecture

General: Turner

Call Northshore whether your job is big or small. Husky stadium required over 100,000 square feet of AEP corrugated, Northclad AL and Metlspan Insulated panels to clad the awesome new home of the Huskies

Mirabella Retirement Community Project:
Mirabella Retirement Community was designed by Ankrom Moisan and built by Turner Construction

Click image to see more.

Location: 116 Fairview Ave Seattle, WA

Finish Year: 2008

Architect: Ankrom Moisan

General: Turner Construction

PRS Mirabella features thousands of Northclad Aluminum panels in 3 colors. These were fabricated locally in our shop. Northshore was able to custom size many of the panels in order to reconcile dimensional issues on this complicated, great looking building. See more finished photos at www.northclad.com

Microsoft Building 98 Project:
Microsoft Building 98 was designed by Callison and built by Snyder Roofing

Click image to see more.

Location: 14820 NE 36th St Redmond, WA

Finish Year: 2009

Architect: Callison

General: Snyder Roofing

Microsoft Building 99 Project:
Microsoft Building 99 was designed by Callison and built by GLY Construction

Click image to see more.

Location: Redmond, WA

Finish Year: 2008

Architect: Callison

General: GLY Construction

River Park Office Building Project:
River Park Office Building was designed by Callison and built by Howard S Wright Construction

Click image to see more.

Location: 7803-7905 159th Pl NE Redmond, WA

Finish Year: 2008

Architect: Callison

General: Howard S Wright Construction

Northclad AL panels installed in a custom color give this building a really fine look that is similar to composites, but at an affordable price.

Microsoft - Building 98 Interior Project:
Microsoft - Building 98 Interior was designed by Callison and built by GLY Construction

Click image to see more.

Location: 24820 NE 36th St Redmond, WA

Finish Year: 2009

Architect: Callison

General: GLY Construction

Marina Point Office Building Project:
Marina Point Office Building was designed by Carlson and built by Colacurcio Brothers Construction

Click image to see more.

Location: 1001 Thomas Glenn Drive Bellingham, WA

Finish Year: 2001

Architect: Carlson

General: Colacurcio Brothers Construction

Marina Point is high end retail and office facility located on the water in Bellingham. Its zinc siding (Rheinzink) exterior is a big part of its appeal. We used custom width panels to assure alignment with the window jambs.

Olivian Tower Project:
Olivian Tower was designed by Carrier Johnson and built by Washington Hanover LLC

Click image to see more.

Location: 809 Olive Way Seattle, WA

Finish Year: 2008

Architect: Carrier Johnson

General: Washington Hanover LLC

This project features Centria Formawall panels in an innovative and interesting pattern. Love the texture!

Providence Medical Clinic Project:
Providence Medical Clinic was designed by Collins Woerman and built by Sellen

Click image to enlarge.

Location: Monroe, WA

Finish Year: 2013

Architect: Collins Woerman

General: Sellen

Insulated panels from Kingspan, Corrugated panels from Morin, and Northclad AL make for a crisp new medical clinic.

Yarrow Bay Marine Services Project:
Yarrow Bay Marine Services was designed by Collins Woerman and built by GLY Construction

Click image to see more.

Location: 507 Lake Washington Blvd NE Kirkland, WA

Finish Year: 2009

Architect: Collins Woerman

General: GLY Construction

Seahawks Practice Facility Project:
Seahawks Practice Facility was designed by Crawford Architects and built by Bayley Construction

Click image to see more.

Location: Seattle, WA

Finish Year: 2008

Architect: Crawford Architects

General: Bayley Construction

Asian Counseling and Referral Services Project:
Asian Counseling and Referral Services was designed by DKA and built by Aldrich and Associates

Click image to see more.

Location: 3639 M.L. King Jr. Way South Seattle, WA

Finish Year: 2008

Architect: DKA

General: Aldrich and Associates

This job featured several profiles of metal siding and roofing, in three colors, for a great look.

Seahawk Stadium Project:
Seahawk Stadium was designed by Elerbe Becket and built by Turner Construction

Click image to enlarge.

Location: Washington State Football/Soccer Stadium Seattle, WA

Finish Year: 2002

Architect: Elerbe Becket

General: Turner Construction

We performed lots of siding work here, including the perforated metal on the score tower and the exterior walls utilizing several custom colors and various profiles of Centria siding. We did not do the vending booths.

Pier 70 Renovation Project:
Pier 70 Renovation was designed by Fuller Sears and built by JR Abbott Construction

Click image to see more.

Location: 2815 Alaskan Way Seattle, WA

Finish Year: 2000

Architect: Fuller Sears

General: JR Abbott Construction

Fuller Sears won awards for the renovation of this old pier building. It has a great combination of color and profile. Challenges during the construction included the tight quarters and the wavy existing building.

Avalon Meydenbauer Project:
Avalon Meydenbauer was designed by GGLO and built by Avalon Bay Communities

Click image to see more.

Location: Bellevue, WA

Finish Year: 2008

Architect: GGLO

General: Avalon Bay Communities

Note the custom fabricated square panels and the AEP Prestige 12" panels. Northclad's flush square panels have a flatter apearance than most "2 sides up 2 sides down panels".

Current filter: Metal Type is Siding Click here to show all 72 jobs
©2024 Northshore Exteriors Inc.
Close X
Loading...