Click image to see more.
Location: 3639 M.L. King Jr. Way South Seattle, WA
Finish Year: 2008
Architect: DKA
General: Aldrich and Associates
This job featured several profiles of metal siding and roofing, in three colors, for a great look.
Click image to enlarge.
Location: Washington State Football/Soccer Stadium Seattle, WA
Finish Year: 2002
Architect: Elerbe Becket
General: Turner Construction
We performed lots of siding work here, including the perforated metal on the score tower and the exterior walls utilizing several custom colors and various profiles of Centria siding. We did not do the vending booths.