WA Phone: (425) 740-3700 HI Phone: (808) 284-9042

Navigation:
Popular:
< Prev Next > Page 1 of 3
Current filter: City is Bellevue Click here to show all 72 jobs
Avalon Meydenbauer Project:
Avalon Meydenbauer was designed by GGLO and built by Avalon Bay Communities

Click image to see more.

Location: Bellevue, WA

Finish Year: 2008

Architect: GGLO

General: Avalon Bay Communities

Note the custom fabricated square panels and the AEP Prestige 12" panels. Northclad's flush square panels have a flatter apearance than most "2 sides up 2 sides down panels".

Bellevue Art Museum Project:
Bellevue Art Museum was designed by Steven Holl and built by Sellen Construction

Click image to enlarge.

Location: 510 Bellevue Way NE Bellevue, WA

Finish Year: 2001

Architect: Steven Holl

General: Sellen Construction

While not actually composite panels , these solid aluminum panels feature the same attention to lines found in most composite jobs.

Bellevue City Hall Project:
Bellevue City Hall was designed by SRG Partnership and built by Lease Crutcher Lewis Construction

Click image to see more.

Location: 450 110th Ave NE Bellevue, WA

Finish Year: 2006

Architect: SRG Partnership

General: Lease Crutcher Lewis Construction

Our design modifications helped shave several million dollars off the recladding of Bellevues new city hall. The siding is formed from .063 aluminum in two colors and several profiles.

Bellevue Science and Technology Building Project:
Bellevue Science and Technology Building was designed by Miller Hull and built by Mortenson Construction

Click image to see more.

Location: 3000 Landerholm Circle SE Bellevue, WA

Finish Year: 2009

Architect: Miller Hull

General: Mortenson Construction

Current filter: City is Bellevue Click here to show all 72 jobs
©2024 Northshore Exteriors Inc.
Close X
Loading...