WA Phone: (425) 740-3700 HI Phone: (808) 284-9042

Navigation:
Popular:
< Prev Next > Page 1 of 4
Current filter: City is Seattle Click here to show all 72 jobs
Masonic Lodge Project:
Masonic Lodge was designed by  and built by

Click image to see more.

Location: Seattle, WA

Finish Year: 2008

Your restoration deserves a craftsman's touch. We replicated this historic cornice with care, by hand and with the aid of computerized fabrication, for a very close match.

Saint Marks Cathedral Project:
Saint Marks Cathedral was designed by  and built by Sellen Construction

Click image to enlarge.

Location: Seattle, WA

Finish Year: 1998

General: Sellen Construction

We formed all the copper panels for this roof in our shop as well as the Celtic Cross and siding.

South Center Mall Addition Project:
South Center Mall Addition was designed by  and built by

Click image to see more.

Location: Seattle, WA

Finish Year: 2008

Husky Stadium Renovation Project:
Husky Stadium Renovation was designed by 360 Architecture and built by Turner

Click image to enlarge.

Location: Montlake Blvd Seattle, WA

Finish Year: 2013

Architect: 360 Architecture

General: Turner

Call Northshore whether your job is big or small. Husky stadium required over 100,000 square feet of AEP corrugated, Northclad AL and Metlspan Insulated panels to clad the awesome new home of the Huskies

Mercer Court Apartments Project:
Mercer Court Apartments was designed by Ankrom Moisan and built by W G Clark

Click image to see more.

Location: 3925 Adams Lane NE Seattle , WA

Finish Year: 2013

Architect: Ankrom Moisan

General: W G Clark

These 5 buildings amounted to 2X the Husky Stadium. Over 5 million dollars in siding installed in under 6 months. The project features Northclad AL panels and AEP Prestige panels. Five colors and multiple arrays of varying panel reveals create interest. Northshore prefabricated flashings to exact lengths, many pre-mitered, and tracked parts via our coding and labeling system. Product was organized and delivered just-in-time floor by floor. Note the unusual mitered blade Prestige Panel corners, which provide an especially crisp look

Rollin Street Project:
Rollin Street was designed by Ankrom Moisan and built by Howard S Wright Construction

Click image to enlarge.

Location: Seattle, WA

Finish Year: 2009

Architect: Ankrom Moisan

General: Howard S Wright Construction

Mirabella Retirement Community Project:
Mirabella Retirement Community was designed by Ankrom Moisan and built by Turner Construction

Click image to see more.

Location: 116 Fairview Ave Seattle, WA

Finish Year: 2008

Architect: Ankrom Moisan

General: Turner Construction

PRS Mirabella features thousands of Northclad Aluminum panels in 3 colors. These were fabricated locally in our shop. Northshore was able to custom size many of the panels in order to reconcile dimensional issues on this complicated, great looking building. See more finished photos at www.northclad.com

Seattle Aquarium Project:
Seattle Aquarium was designed by Buffalo Design and built by Porter Brothers Construction

Click image to enlarge.

Location: 1421 Alaska Way Seattle, WA

Finish Year: 1998

Architect: Buffalo Design

General: Porter Brothers Construction

The copper fish gutter hangers are functional art. See us if you have a cool metal idea like this. We can get it done.

Current filter: City is Seattle Click here to show all 72 jobs
©2024 Northshore Exteriors Inc.
Close X
Loading...