WA Phone: (425) 487-1111 HI Phone: (808) 284-9042

Navigation:
Popular:
< Prev Next > Page 1 of 1
Current filter: City is Everett Click here to show all 248 jobs
Everett C.C. Arts and Science Building Project:
Everett C.C. Arts and Science Building was designed by LMN and built by Mortenson Construction

Click image to see more.

Location: 2000 Tower Street Everett, WA

Finish Year: 2006

Architect: LMN

General: Mortenson Construction

Here we installed Prodema (a wood composite product from Spain). The panel joints and fasteners were made to align with the window mullions. This one really stands out from the rest.

SNBL Addition Project:
SNBL Addition was designed by Gary Parkinson RA and built by

Click image to see more.

Location: 6605 Merrill Creek Parkway Everett, WA

Finish Year: 2006

Architect: Gary Parkinson RA

These panels are from Proclad. The .063 panels with stiffeners provide a very flat appearance and are all formed with lines in a grid.

Providence Women and Childrens Center Project:
Providence Women and Childrens Center was designed by NBBJ and built by Newland Construction

Click image to see more.

Location: 900 Pacific Avenue Everett, WA

Finish Year: 2002

Architect: NBBJ

General: Newland Construction

This project features Trespa, a composite material from the Netherlands, in three custom colors. It also features a wall from Pro-clad, in Canada. The roofs drain through interesting stainless steel water features. NBBJ designed an exciting building.

Everett Mall Entry Project:
Everett Mall Entry was designed by Mulvanny and built by SD Deacon Construction

Click image to enlarge.

Location: 1402 S Everett Mall Way Everett, WA

Finish Year: 2005

Architect: Mulvanny

General: SD Deacon Construction

This included flashing various elements.

Everett School District Maintenance Facilitiy Project:
Everett School District Maintenance Facilitiy was designed by Klappenbach and built by E Kent Halvorson Construction

Click image to enlarge.

Location: 2210 Everett Avenue Everett, WA

Finish Year: 2003

Architect: Klappenbach

General: E Kent Halvorson Construction

Curved coping and dormers keep this installation interesting.

Korry Electronics Project:
Korry Electronics was designed by Craft and built by Foushee Construction

Click image to enlarge.

Location: 11910 Beverly Park Rd Everett, WA

Finish Year: 2009

Architect: Craft

General: Foushee Construction

CHCSC Administration Building Project:
CHCSC Administration Building was designed by TGBA and built by JR Abbott Construction

Click image to enlarge.

Location: 8609 Evergreen Way Everett, WA

Finish Year: 2008

Architect: TGBA

General: JR Abbott Construction

Current filter: City is Everett Click here to show all 248 jobs
©2018 Northshore Exteriors Inc.
Close X
Loading...