WA Phone: (425) 487-1111 HI Phone: (808) 284-9042

Navigation:
Popular:
< Prev Next > Page 1 of 1
Current filter: General is Absher Construction Click here to show all 243 jobs
Leeward Community College Project:
Leeward Community College was designed by Urban Works Inc and built by Absher Construction

Click image to see more.

Location: 94-045 Ala Ike Street Pearl City, HI

Finish Year: 2013

Architect: Urban Works Inc

General: Absher Construction

This sleek new building featured thousands of square feet of NorthClad ACM siding and soffits and trim to match. Everyone loves the look and quality!

Phantom Lake Elementary Project:
Phantom Lake Elementary was designed by Northwest Architectural Company and built by Absher Construction

Click image to enlarge.

Location: 1050 160th Ave SE Bellevue, WA

Finish Year: 2002

Architect: Northwest Architectural Company

General: Absher Construction

This school features lots of AEP metal siding and flashing, as well as our large gutter.

Monroe Correctional IMU and SEG Units Project:
Monroe Correctional IMU and SEG Units was designed by Integrus and built by Absher Construction

Click image to enlarge.

Location: Monroe, WA

Finish Year: 2005

Architect: Integrus

General: Absher Construction

We performed the screen wall siding and flashing with AEP materials.

Cougar Mountain Jr High School Project:
Cougar Mountain Jr High School was designed by Erickson McGovern and built by Absher Construction

Click image to enlarge.

Location: 5108 260th St E Graham, WA

Finish Year: 2003

Architect: Erickson McGovern

General: Absher Construction

This features our fabulous 7" continuous gutter and tight flashing workmanship.

Current filter: General is Absher Construction Click here to show all 243 jobs
©2017 Northshore Exteriors Inc.
Close X
Loading...