Click image to enlarge.
Location: Washington State Football/Soccer Stadium Seattle, WA
Finish Year: 2002
Architect: Elerbe Becket
General: Turner Construction
We performed lots of siding work here, including the perforated metal on the score tower and the exterior walls utilizing several custom colors and various profiles of Centria siding. We did not do the vending booths.
Click image to see more.
Location: 900 Pacific Avenue Everett, WA
Finish Year: 2002
Architect: NBBJ
General: Newland Construction
This project features Trespa, a composite material from the Netherlands, in three custom colors. It also features a wall from Pro-clad, in Canada. The roofs drain through interesting stainless steel water features. NBBJ designed an exciting building.
Click image to see more.
Location: 1616 Eastlake Ave E Seattle, WA
Finish Year: 2002
Architect: NBBJ
General: Sellen Construction
This project used Centrias aluminum profile siding. Note the mitered corrugated corners.
Click image to enlarge.
We worked on several phases of this unique residence. We performed the custom. curved siding on the tower and siding and curved roofing on the guest house.
Click image to enlarge.
Location: 1050 160th Ave SE Bellevue, WA
Finish Year: 2002
Architect: Northwest Architectural Company
General: Absher Construction
This school features lots of AEP metal siding and flashing, as well as our large gutter.
Click image to enlarge.
Location: 4854 154th Place NE Redmond, WA
Finish Year: 2002
Architect: Zimmer Gunsul Frasca
General: Skanska Construction
You have to go on campus to see all the interesting work ZGF designed. It features some 18 ga flat wall panels and some verti-line panels from AEP Span.
Click image to enlarge.
Location: 34515 9th Ave S. Federal Way, WA
Finish Year: 2002
Architect: Callison
General: Sellen Construction
We provided flashing in several colors on this addition.
Click image to enlarge.
Location: 155 Mercer St Seattle, WA
Finish Year: 2002
Architect: Callison
General: WG Clark Construction
The theatre addition features flashing with sweeping curves and custom color red kynar paint.
Click image to enlarge.
Location: 2401 Utah Ave S Seattle, WA
Finish Year: 2002
Architect: NBBJ
General: Turner Construction
The transformation of the Sodo center occurred over several phases. We installed some heavy aluminum, some corrugated panels, and lots of flashing.
Click image to enlarge.
Location: 1101 Hoquiam Ave NE Renton, WA
Finish Year: 2002
Architect: DLR Group
General: Wick Construction
Pie shaped roofing panels and curved flashing. You cant be too cool for this school.
Click image to see more.
Location: 7824 Mukilteo Speedway Mukilteo, WA
Finish Year: 2002
Architect: Driftmier
General: Sierra Construction
We did the building closest to the road with AEPs Klip Rib. This is a structural panel with concealed fasteners. We installed our industrial gutter.
Click image to enlarge.
Location: 12040 NE 128th St. Kirkland, WA
Finish Year: 2002
Architect: Kaplan Mclaughlin Diaz
General: Berschauer Phillips Construction
K.M.D. designed a very cool screen wall and penthouse enclosure, with AEP custom color products gridded out in an interesting way.
Click image to enlarge.
Location: 2700 156th Ave NE Bellevue, WA
Finish Year: 2002
Architect: Baylis
General: Skanska Construction
We provided the custom formed flush panels below the cornice as well as the sunscreen, which we provided custom extrusions and welded brackets for.
Click image to enlarge.
Location: 16495 NE 74th St Redmond, WA
Finish Year: 2002
Architect: Studio Meng Strazzara
General: Howard S Wright Construction
Our flashing completes the look.
Click image to enlarge.
Location: 225 S 152nd St Burien, WA
Finish Year: 2002
Architect: BLRB
General: Ferrell Penning Construction
This features a new metal roof and gutter.
Click image to enlarge.
Location: 915 Second Ave. Seattle, WA
Finish Year: 2002
Architect: Bassetti
General: Rushforth Construction
Click image to enlarge.
Location: 18501 36th Ave S Seattle, WA
Finish Year: 2002
Architect: GGLO
General: Lease Crutcher Lewis Construction
This job contained miles of 1 2 round gutter for a true NW look.
Click image to enlarge.
We performed the flashing on the lower roof for McCarthy.
Click image to enlarge.
Location: 2440 S. 166th St Seatac, WA
Finish Year: 2002
Architect: URS Greiner
General: PCL Construction
We did the Centria Formawall siding up top and the stainless flashing down at the base building.
Click image to enlarge.
Location: 19881 State Highway #2 Monroe, WA
Finish Year: 2002
Architect: Freiheit and Ho
General: WG Clark Construction
This remodel was designed to blend in with the existing.
Click image to enlarge.
Location: 22915 NE Aldercrest Dr. Redmond, WA
Finish Year: 2002
Architect: Lance Mueller and Associates
General: GLY Construction
Nice metal roofs from AEP Span.
Click image to enlarge.
Location: 413 Lilly Rd Ne Olympia, WA
Finish Year: 2002
Architect: Griffin Bolte Jurgens
General: Sellen Construction
We did the flashing for the reroof.
Click image to enlarge.
Location: 305 Harrison St Seattle, WA
Finish Year: 2002
Architect: Miller Hull
General: Howard S Wright Construction
This job features primarily flashing, at the Seattle Center.
Click image to enlarge.
Location: 10001 57th Ave S. Seattle, WA
Finish Year: 2002
Architect: DLM
General: MJ Takisaki Construction
New fascia metal was formed in our shop.
Click image to see more.
Location: 4300 15th Ave Ne Seattle, WA
Finish Year: 2002
Architect: Mahlum
General: Lease Crutcher Lewis Construction
We performed flashing for the roof, including stainless coping and counterflashing.
Click image to enlarge.
Location: 668 South Lane St Seattle, WA
Finish Year: 2002
Architect: Driscoll
Click image to enlarge.
Location: 1215 E Union St. Seattle, WA
Finish Year: 2002
Architect: Miller Hull
General: GLY Construction