WA Phone: (425) 487-1111 HI Phone: (808) 284-9042

Navigation:
Popular:
< Prev Next > Page 1 of 3
Current filter: Finish Year is 2001 Click here to show all 243 jobs
Bellevue Art Museum Project:
Bellevue Art Museum was designed by Steven Holl and built by Sellen Construction

Click image to enlarge.

Location: 510 Bellevue Way NE Bellevue, WA

Finish Year: 2001

Architect: Steven Holl

General: Sellen Construction

While not actually composite panels , these solid aluminum panels feature the same attention to lines found in most composite jobs.

Harrison Memorial Hospital Project:
Harrison Memorial Hospital was designed by Kaplan Mclaughlin Diaz and built by Sellen Construction

Click image to enlarge.

Location: 2520 Cherry Ave Bremerton, WA

Finish Year: 2001

Architect: Kaplan Mclaughlin Diaz

General: Sellen Construction

This building, nestled into the trees on the hills of Silverdale, features a Hemlock green metal roof, anodized flat panels siding accents, and stainless gutters. It speaks for itself.

Woodinville Retail Expansion Project:
Woodinville Retail Expansion was designed by Fuller Sears and built by GLY Construction

Click image to enlarge.

Location: Woodinville, WA

Finish Year: 2001

Architect: Fuller Sears

General: GLY Construction

Fuller Sears designed more than a dozen buildings for this large retail complex, with many interesting uses of architectural metal. Colors, curves, texture and interesting angles prevail on these buildings which will look great for decades!

Crate and Barrel Bellevue Square Project:
Crate and Barrel Bellevue Square was designed by NBBJ and built by Skanska Construction

Click image to enlarge.

Location: Bellevue Square Bellevue, WA

Finish Year: 2001

Architect: NBBJ

General: Skanska Construction

White aluminum panels and zinc soffit and fascia panels complete the look.

Current filter: Finish Year is 2001 Click here to show all 243 jobs
©2016 Northshore Exteriors Inc.
Close X
Loading...